Unit summary

  • Functional requirements state what the system does, and non-functional requirements state how well.
  • The SRS is the official statement of requirements and must be complete, unambiguous and verifiable.
  • Requirements engineering includes feasibility study, elicitation, specification, validation and management.
  • A proactive risk strategy plans before risks occur.
  • Risk exposure is probability multiplied by the cost of loss.
  • RMMM covers mitigation, monitoring and management of each risk.
  • Pricing depends on cost and on market and contractual factors.
  • Scheduling uses a work breakdown structure, a Gantt chart and the critical path.
  • Agile planning is incremental, and velocity forecasts the work.
  • COCOMO and function points estimate effort and size.

Glossary

Term Meaning
COCOMO An algorithmic model that estimates effort from size.
Contingency plan Actions to take if a risk occurs.
Critical path The longest path in a task network.
Elicitation Discovering requirements from stakeholders.
Function point A measure of software size based on user-visible functions.
Functional requirement A statement of what the system must do.
Gantt chart A bar chart of tasks against time.
Milestone A checkpoint at which progress is measured.
Mitigation Reducing the probability or impact of a risk.
Non-functional requirement A constraint on how the system performs its services.
Requirement A statement of a service or constraint on a system.
Risk A potential problem that would cause loss if it occurred.
Risk exposure Probability of a risk multiplied by the cost of its loss.
RMMM Risk mitigation, monitoring and management.
Slack Spare time of a task off the critical path.
SRS The software requirements specification document.
Story point A unit of the relative size of a user story.
Traceability The ability to follow a requirement through design and testing.
Validation Checking that requirements are what the customer wants.
Velocity Story points completed per iteration.

Question bank

Short Answer Questions (2 marks each)

  1. Distinguish functional and non-functional requirements.
  2. What is an SRS?
  3. What is requirements elicitation?
  4. Name two requirements validation techniques.
  5. What is a proactive risk strategy?
  6. How is risk exposure calculated?
  7. What does RMMM stand for?
  8. What is a milestone?
  9. What is the critical path?
  10. What is velocity in agile planning?

Medium Answer Questions (5 marks each)

  1. Explain functional and non-functional requirements with examples.
  2. Describe the contents and qualities of an SRS.
  3. Explain requirements elicitation and analysis.
  4. Explain requirements validation and management.
  5. Distinguish reactive and proactive risk strategies.
  6. Explain risk projection and risk refinement.

Long Answer Questions (15 marks each)

  1. Explain the requirements engineering process in detail.
  2. Explain software risks and the steps of risk identification, projection and refinement, with an example of computing risk exposure.
  3. Explain the RMMM plan with an example, and the risk information sheet.
  4. Explain software pricing, project scheduling and the critical path, and the estimation techniques, including Basic COCOMO. Estimate the effort for an organic project of 20 KLOC.

Sources

  • Official BCA syllabus Software Engineering, course code 26BCA403DS03, Unit II